Git Milestones ​

d5e5a4c — v4 r3 baseline ​

2026-08-15 · chore: snapshot polished v4 r3 baseline

The first complete repository snapshot: game core, circular Canvas, tests, pixel-asset workflow, v1–v4 exports, QA evidence and design framework. Earlier versions were visual exports rather than individual commits.

8c4b0d2 — v5 visual lock ​

2026-08-15 · feat: deliver console-rgb16 outlined relic v5

111 frames, the 16-color palette, continuous outlines, CJK atlas, runtime manifest, code-drawn UI colors and final web QA. This is the visual golden baseline used by the ESP32 migration.

5c0b1e7 — migration handoff ​

2026-08-16 · docs: add esp32 migration handoff

Froze public/internal names, economy, 466×466 geometry, gesture transactions, asset budget, LVGL architecture and M0–M6 milestones.

ff691b7 — ESP32 v6 ​

2026-08-16 · feat: deliver OLED device milestone v6

Added the ESP-IDF project, hardware lock, device validation, asset conversion, C++ golden tests, incremental rendering, RTC/NVS, settings, ambient and device scripts. Final v6 hardware measured about 29.8 FPS.

9bfe9a6 — Web v7 ​

2026-08-17 · feat: deliver web interaction milestone v7

Added three-stage hold/burst, banded tilt, clearance validation, scoped battery, settings interaction, strict wake and edge/SHOP transaction fixes, creating the next device contract.

Why there are few commits ​

This is not a linear repository with one commit per v1–v7 step. Much early iteration occurred inside one extended objective and v4 became the first snapshot. The roadmap separates visible asset versions from traceable Git nodes rather than fabricating history.